产品详情
简单介绍:
韩国振动机抛光机此款机器三星,LG 等一系列手机电子厂的喷涂工艺检测.检测手机电池背盖,手机按键.手机导航件.手写笔.听筒丝网.手机框.等一系列喷涂所需检测。
详情介绍:
产品名称:韩国振动机抛光机 | |
详细介绍:韩国振动机抛光机韩国振动机抛光机 | |
1.Warraty period of this equipment is 1 year or 2000 hours whichever comes first. and warranty period of the electrical parts is 6 months.
This is based on the normal operation, operator’s mistake or mishandling of the equipment, excessive operation beyond its capability and failure to maintain on time will release the warranty obligation.
2. In any case that the user has changed the machine parts or corrected without any prior agreement, this warranty will be invalid..
PAINTING DURABILITY TESTER MACHINE
MODEL : TC - 15 (SM - 1502)
I. COMPOSITION OF THE EQUIPMENT
1. VIBRATORY TUMBLER
2. SOUND COVER
3. AUTO WATER & COMPOUND SUPPLY SYSTEM
4. CONTROL UNIT
II. SPECIFICATION OF THE EQUIPMENT
1. VIBRATORY TUMBLER
Tub interior dimension: W180mm x L530mm
In-put area dimension: W130mm x L530mm
LINING : Hot pour Polyurethane Casting, Thickness: 15mm
Motor : 220V x 1Hp x 3ph x 60Hz. (2 pole)
Motor R.P.M : 3500
2. SOUND COVER
L920mm x W620mm x H900mm+120mm
Top door with Gas Cylinder
3. AUTO WATER & COMPOUND SUPPLY SYSTEM
Water tank, metered to be 500ml
Water tank, metered to be 1000ml + addition of Compound 200ml
Water tank, metered to be 500ml + addition of Compound 20ml
Compound metering pump 300ml/min, adjusted to supply 200 ml by a timer.
Compound metering pump 20ml/min, adjusted to supply 20 ml by a timer.
III. UTILITY REQUIREMENT
1 Electrical Power: 220V x 1Ph (20A).
2 Tap water: 4L/Hr. (To be linked to the right side of the control unit by 8mm hose.)
IV. INSTALLATION
Just place on the flat concrete floor without any anchoring.
In case the equipment is not horizontally leveled, the mass in the tumbler can move to a side,
please be careful.
Please link 3 wires from the motor to the U.V.W. terminal in the control box.
Please link 2 wires from the main source of electrical power to the R.T. terminal in the box.
Please link tap water to the supply valve on the right side of the control box by 8mm hose.
In case Tap water contains some foreign substance, please install pre-filter before this hose.
Please link a hose(20mm) from the hose nipple on left side of the control box to the main machine.
A little longer hose is shipped with machine, please cut it off and adjust depending on
the site allocation
. Please link the discharge valve on the rear side of machine to the laboratory discharge pipe line.
Please leave the discharge valve always open except for the maintenance.
A compound container needs to be placed in the room under the control box.
Please remove the top lid and place the container in the room and put a separate lid pre-drilled
on 3 places, 1 big hole in the center and 2 small holes on the right and left.
On the center hole, please place a level sensor which emit alarm when there is not enough
compound in the container,
and on the right and left holes insert 2 hoses that come from the metering pumps.
V. OPERATION
Supply the control box with power (put the Breaker switch ON, put the disconnect switch ON) and
put the selector switch ON, then you will have light on the Power lamp.
Fill the vibratory tumbler with media 15L (11.25L of Cone and 3.75L of Pyramid).
Put the Mode to Manu and push on Start.
If the mass turns from front to back, the motor direction is correct.
In case it turns in the opposite direction please correct by changing the wire.
1. PREPARATION COURSE
The media contains some flashes and burrs. This course is, prior to the main course of testing,
to condition the media by tumbling to the right purpose of the testing.
First of all, put MODE to Manu and push on PRE WATER-1, then 500ml tank will be filled with water.
Pls push on only once, if you push on twice it will be stopped.
O Once it is full, it will be automatically disconnected. When the water is evacuated, the tank
is automatically refilled, therefore from next time, there is no need to put to Manu and fill again.
.
Set the timer 4 hours or 10 hours as required by your company (currently designated to be 10 hours).
Put Mode to PRE and push on Start then the tumbler will start to run and 2000 ml of water
will be supplied automatically.(4 times of 500ml)
At the time of start, 2000ml will be supplied and 500ml will be supplied every 30 min. automatically.
The tank always keeps water 500ml. and supplies when it is required.
2. MAIN COURSE OF TESTING
This course is to test whether the testing parts are safe or damaged when the media and parts
have rubbed each other in the vibratory tumbler.
First of all, put MODE to Manu and push on MAIN Water-1, then water will be ready with 1000ml
in the tank 1, push on MAIN Water-2 then water will be ready with 500ml in the tank 2.
Push on Comp-1, then 200ml of compound will be added to 1000ml of water in the tank-1.
Push on Comp-2, then 20ml of compound will be added to 500ml of water in the tank-2.
Pls push on only once, if you push on twice it will be stopped.
Once you have filled for the first time, when the liquid is evacuated, it is made again automatically
therefore there is no need to do manually again.
Set the timer 1 hour or 2 hours as required by your company.
Put the MODE to Manu and start the machine, then 1000mml of water and 200ml of compound
will be automatically supplied in the beginning and 500ml of water and 20ml of compound
will be supplied every 30 min.
(Note) When there is not enough compound, you will have Alarm light on the control panel,
please fill the container with compound.
.
|